2.9.1.2. Installation
|
Fig. 2.311. An order of installation of fastenings of a retsirkulyatsiya of the fulfilled gases
|
Establish bolts and a nut of fastening of a pipe of a retsirkulyatsiya of the fulfilled gases in an order shown in drawing 2.311.
|
Fig. 2.312. Combination of adjusting labels throttle branch pipe and air hose
|
Combine labels on a throttle branch pipe and an air hose (fig. 2.312).
NOTE
Before installation of an air line of system of an admission, be convinced that rubber fastenings on an arm of the storage battery are on the places.
At installation of an air line of system of an admission in rubber fastenings use soap water.
|
Be convinced of that two rubber fastenings are established on an arm of the storage battery.
Establish an air line of system of an admission in rubber fastenings.
|
Fig. 2.313. Installation of the panel of a radiator and air line of system of an admission
|
Using a bracket, fix the panel of a frame of a radiator and an air line of system of an admission as is shown in drawing 2.313.
|
Fig. 2.314. Installation of the socket of the RSM block
|
Completely insert the PCM block socket into the air filter and press the lever before click (fig. 2.314).
Establish other components as it should be, the return to removal.
|